The purpose of the unit is to provide for the financing, 设计, construction, maintenance and operation of a stormwater management system, plan for future infrastructure needs for drainage, accrue or borrow funds for future work, and carry out such work for all primary drainage infrastructure as determined by the county engineer. The purpose shall include the financing of the county's National Pollutant Discharge Elimination System's (NPDES) permit and its requirements, as well as any costs associated with the total maximum daily loads (TMDLs) program. The purpose shall also include water quality monitoring and native and invasive aquatic plant control with the use of chemical, biological and mechanical methods.
Advisory Board Members
- 椅子: Dr. Mary-Ellen Kiss
- Vice 椅子: Dave Evans
- Sandra Funk
- 空
- 空
Applications are being accepted to fill two positions with a term through 10月ober 31, 2024, and 10月ober 31, 2025.
Meeting Dates
Ordinances
联系
艾丽卡 LeMaster
社区 Liaison
电话: 941.575.3626
电子邮件: 艾丽卡.LeMaster@CharlotteCountyFL.政府
Charlotte County Public Works Department
7000 Florida Street,
Punta Gorda, FL 33950